|
Episode 1695 - Lacerta 35th P1: Advisor, Devisor, Electrician, Official, Tribe, Vanna, ~ 06 ``Checks complete. Sufficient fuel for the trip and they will top me up. Auto course laid in for Lacerta. Mach 9.2K. Si. And zoom. ETA 5.7 hours. Wonderful improvements. I am going for a snooze as it will be morning time when I arrive. [Later] ``Tetra: I have timed that right. Decelerating time. Manual docking mode. [Clink] Docked. ``Advisor: Zibo Vanna. ``Advisor: Zibo Advisor. [Hugs]. If you are fit they are all waiting for you. ``Vanna: Let us get on. {Lacerta Space Works ~ 5} ``Zibo everyone. [Zibo's] ``Vanna: Have you got an oxygen and carbon dioxide analyser, which does exhaust emissions? ``Devisor: Qaa, but I will go and buy one now. ``Vanna: When did this problem start? ``Advisor: Yesterday, when we started run up checks. ``Vanna: I need you to check the voltage levels on Engine 3, and is it delivering the correct current rating? ``Official: I will fetch the Electrician in now. ``Devisor: Works are now making a permanent fixture for the analyser, so we have time for drinks. --- ``Electrician: These levels are okay, but I am not happy overall. ``Vanna: Will you quin, check the main power source to number 3 engine? ``Electrician: Certus. I need to check it out on the test bench, and I will need at least half time. ``Vanna: It will not be the answer alone, but a potential fault. ``Official: Pop over to the Munch bar, and we will call you. [Munch Bar] ``Advisor: None of us have ever considered these things you have mentioned. ``Vanna: It is a process of elimination, but it has to be something odd. ``Advisor: So it is not serious? ``Vanna: Too early to say. On Cosmo 3, is it possible to sort out the stops, because Earth is till coming up saying 8 hours, as it is straight down. Can you also extend the south stops a little further, quin? We needed it the 'earthquake detector' but could not find it! Is it still on Cosmo 2? ``Advisor: I will pass it on. Okay we can go back. [Lacerta Space Works] ``Devisor: The Electrician has changed some components to a different type. This analyser is showing up as not good. ``Vanna: Change the crystals and use the two decontamination filters. --- ``Devisor: That has been done. ``Vanna: Start up the 3rd Engine only. ``Advisor: We have never done it before! ``Vanna: Get the manual out! ``Advisor: Okay sequence activated and powering up. ``Devisor: The analyser gauge has improved. ``Vanna: Check all instruments. ``Devisor: They are reading okay. ``Vanna: Start up Engine 1 and then 2. ``Devisor: We are rolling out Cosmo 4. --- Checks completed. ``Vanna: Balance check. ``Devisor: Standby. All three lights are now showing amber. ``Vanna: 20% power and lift off. ``Advisor: That has gone straight up to ALT 20Km. ``Vanna: 40% power. ``Official: That is far better and we have Mach 1.5K. ``Vanna: 60% should give us Mach 3K. ``Devisor: This is amazing, now she is travelling. ``Vanna: Official: It is all yours. ``Devisor: Set course back to works. ``Advisor: Certus. ``Official: Oh Vanna! I am grateful. ``Vanna: My pleasure. ``Advisor: Landing back, and landed. ``Vanna: Advisor and I are going out for lunch. ``Official: Approved. {Blue Mountain Tribe ~ 2} ``Tribe: Vanna quano. ``Vanna: Tribe, how are you? ``Tribe: Many changes happening. ``Vanna: We need to talk professionally. ``Tribe Certus. Many novices are rebelling as I cannot cope and I have to turn them away. ``Vanna: Exactly. Let them go and start up a beginners group in another location, and specialize our site for experienced users only. ``Tribe: I approve. There are some who have suggested it. ``Vanna: It will take them 5 years to develop if they last that long so let it happen. ``Tribe: Certus. ``Vanna: That will allow us to enhance what we are doing as you were being dragged down. ``Tribe: Spot on Vanna. < Previous Page 1694 Ursa <42.3.2> Warm [01 | 1503 <1696> 00/206] Next Page 1696> |
Register
Broken Link
Contact us
Back to Top
Home Page